Abu Dhabi, UAE – September 6, 2023: ADNOC has announced a final investment decision (FID) to develop one of the largest carbon capture projects in the Middle East and North Africa (MENA) region. The pioneering Habshan carbon capture, utilization and storage (CCUS) project will have the capacity to capture and permanently store 1.5 million tonnes per annum (mtpa) of carbon dioxide (CO2) within geological formations deep underground.
Today’s announcement is part of ADNOC’s wider carbon management strategy, which aims to create a unique platform that connects all the sources of emissions and sequestration sites to accelerate the delivery of ADNOC and the UAE’s decarbonization goals. As part of this strategy, the company is implementing several innovative, technology driven pilot projects, including CO2 mineralization and full carbon sequestration in saline aquifers. Using best-in-class technology, the project will triple ADNOC’s carbon capture capacity to 2.3 mtpa, equivalent to removing over 500,000 gasoline-powered cars from the road per year.
The project, to be built, operated and maintained by ADNOC Gas on behalf of ADNOC, will include carbon capture units at the Habshan gas processing plant, pipeline infrastructure, and a network of wells for CO2 injection. As part of ADNOC’s ongoing decarbonization efforts, CO2 will be permanently stored in reservoirs deep in the sub-surface through the deployment of closed-loop CO2 capture and reinjection technology at the well site. The FID to develop the project fully aligns with ADNOC’s recently announced Net Zero by 2045 ambition and forms part of the company’s initial $15 billion (AED55 billion) decarbonization investment in low carbon solutions.
Musabbeh Al Kaabi, ADNOC Executive Director of Low Carbon Solutions and International Growth, said: “The Intergovernmental Panel on Climate Change has stated that carbon capture and storage is a critical enabler for the world to achieve net zero by mid-century. This landmark project, is one of many tangible initiatives that ADNOC is delivering as we accelerate our decarbonization plan to meet our Net Zero by 2045 ambition. “As ADNOC continues its transformation towards a lower carbon future, it is our intention to make further investments to significantly reduce our emissions, including in carbon capture and storage, and push the boundaries of innovation and technology with our partners, to build on our world-leading legacy and industry leadership in carbon management.”
ADNOC has placed sustainability at the heart of its long-term strategy. The company is decarbonizing its operations while also investing in renewables and low carbon fuels, building a global hydrogen value chain, deploying innovative climate technology solutions, and advancing nature-based solutions such as planting mangroves in the UAE.
In 2016, ADNOC opened its first carbon capture, transportation and storage facility at Al Reyadah in Abu Dhabi. The facility has the capacity to process up to 800,000 tons of CO₂ per year captured at Emirates Steel Arkan. Building on Al Reyadah, the Habshan carbon capture project could provide for enhanced oil recovery of industry leading low carbon-intensity barrels as well as the production of low-carbon feedstocks such as hydrogen, to help customers decarbonize their operations. ADNOC and Occidental are also working to assess potential investment opportunities in the UAE and the United States in both carbon capture and storage and direct air capture.
As part of its longstanding decarbonization drive, ADNOC currently acquires 100% of its grid power from the Emirates Water and Electricity Company’s (EWEC) nuclear and solar sources, making the company the first major oil and gas company in the world to decarbonize its power at scale though an agreement of this kind. Furthermore, ADNOC is developing a $3.8 billion (AED14 billion) project to build a sub-sea transmission network, which upon completion, could reduce ADNOC’s offshore carbon intensity by up to 50%.
Abu Dhabi, UAE – October 17, 2023: ADNOC Gas, a large-scale integrated gas processing company, today announced a multi-year liquified natural gas (LNG) supply agreement, valued between $500 million (AED1.8 billion) and $700 million (AED2.5 billion), with JERA Global Markets, a trading subsidaiary of JERA Co., Inc. This agreement builds on the long-standing relationship between the UAE and Japan, and reinforces ADNOC Gas’ position as a global LNG export partner of choice. Japan is a vital energy partner for the UAE, and this agreement bolsters ADNOC’s growing track record of fostering strategic partnerships with Japanese energy companies. Commenting on the agreement, Ahmed Alebri, Chief Executive Officer of ADNOC Gas, said: “This LNG supply agreement marks a significant milestone in ADNOC Gas’ long-standing strategic partnership with JERA Co., Inc, demonstrating our continuous and shared commitment for advancing sustainability in the energy sector and supporting a reliable and cleaner energy future for Japan and beyond.” Natural gas continues to play a crucial role as a transitional fuel with lower carbon emissions compared to other fossil fuels. It also serves as an important raw material in industrial value chains. Kazunori Kasai, Chief Optimization Officer, JERA Co., Inc. and Chairman, JERA Global Markets, said: “We are pleased to continue our LNG partnership with ADNOC Gas as the JERA Group continuously looks towards strengthening our global LNG portfolio with stable, flexible and competitive LNG supply, which is essential in the energy transition.” This agreement follows several significant international LNG sales agreements that ADNOC Gas has recently signed, including agreements with PetroChina International Co., Ltd. (PCI), Japan Petroleum Exploration Co., Ltd. (JAPEX), TotalEnergies Gas and Power, and India Oil Corporation (IOCL). The total value of LNG supply agreements signed by ADNOC Gas since its listing in March this year is between $9.4 billion (AED34.5 billion ) and $12 billion (AED44 billion). Constructed in the 1970s, ADNOC’s LNG production facilities on Das Island supplied LNG to the Tokyo Electric Power Company (one of the parent companies of JERA Co., Inc.) for over 40 years. This new supply agreement with JERA Global Markets renews and further enhances the partnership. ADNOC Gas continues to leverage opportunities arising from ADNOC’s integrated gas masterplan which links every part of the gas value chain in the UAE, ensuring a sustainable and economic supply of natural gas to meet local and international demand.
21 June 2023-The consortium led by ENGIE and POSCO was awarded land block (Z1-02) by Hydrom, the orchestrator and master planner of Oman's green hydrogen industry. Spanning 340 sq km, the concession block is located in Duqm, with downstream elements to be established at the Port of Duqm. Continuing their alliance which began through the signing of an MoU in March 2022, ENGIE and POSCO have announced their role as spearheads in a consortium designed to mobilize Oman's renewable energy resources through the development of a green ammonia project with a capacity of 1.2 million tonnes per year. Other partners in the consortium include Samsung Engineering, Korea East-West Power Co. (EWP), Korea Southern Power Co. (KOSPO), and FutureTech Energy Ventures Company Ltd. (a subsidiary of PTTEP). The project will include up to approximately 5 GW of new wind and solar capacity, Battery Energy Storage System (BESS) and a renewable hydrogen plant with a capacity of up to 200 ktpa. The hydrogen will then be transported by a hydrogen pipeline to be built till the port of Duqm where it will feed the ammonia production plant. 1.2 mtpa of green ammonia will be exported in Korea in 2030. The project contract will last for a period of 47 years, broken down into a seven-year development and construction phase followed by a 40-year operational period. Construction is projected to begin in 2027, with the first shipment of green ammonia to Korea planned for the second half of 2030. The consortium will carry out the feasibility and technical studies, in order to finalize the total capital expenditure requirement for the project.